In this Grid News and Views episode of the Connectology® Podcast, Roadnight Taylor's Pete Aston hosts colleagues Nikki Pillinger, Philip Bale and Kyle Murchie as they discuss National Grid ESO and the DNOs' progress with the Technical Limits initiative, and:
- How valid is the data behind your DNO curtailment assessment?
- The milestones calculator for transmission-connecting projects
- The migration of the Electricity System Operator (ESO) to the National Energy System Operator (NESO)
- The consultation on the change in threshold for Large Generators
- The risks to developers/investors of the use by network operators of sustained ratings vs cyclic ratings in modelling and operating ANM schemes
- The NGESO consultation on market mechanisms to unblock transmission-level thermal constraints to demand and generation
- The ESO's 'Technical Solution 2' for enabling battery connections
- The lack of a route for accelerating demand connections caught up in transmission-level constraints
- The proposed Regional Energy Strategic Planners
Recorded 1 February 2024
Version: 20241125
Comments (0)
To leave or reply to comments, please download free Podbean or
No Comments
To leave or reply to comments,
please download free Podbean App.